In 1940 (Showa 15), Mitsui Mine Co., Ltd. soon after laying a dedicated road connecting Ashibetsu Station ~ Nishi Ashibetsu Station 4.1km for coal transportation of Mitsui Ashibetsu Coal Mine, the Ministry of military demand increased coal production With the extension of the transportation route received It is a bridge completed in 1945 (Showa 20). The bridge length is 94m, and the height from the river floor of the Tanzan River flowing under the bridge is 32m. It means that a huge amount of coal was transported by the abolition of the mine in March 1989. ...
"A vehicle is parked on the bridge" Even though I knew the information, when I actually saw it, I couldn't help but say "Oh". There are only vehicles on the abandoned bridge. But something is good. The harmony with the surrounding nature was very nice.
Remnants of the past day
In 1940 (Showa 15), Mitsui Mine Co., Ltd. soon after laying a dedicated road connecting Ashibetsu Station ~ Nishi Ashibetsu Station 4.1km for coal transportation of Mitsui Ashibetsu Coal Mine, the Ministry of military demand increased coal production With the extension of the transportation route received It is a bridge completed in 1945 (Showa 20). The bridge length is 94m, and the height from the river floor of the Tanzan River flowing under the bridge is 32m. It means that a huge amount of coal was transported by the abolition of the mine in March 1989. ...
why are you here?!
"A vehicle is parked on the bridge" Even though I knew the information, when I actually saw it, I couldn't help but say "Oh". There are only vehicles on the abandoned bridge. But something is good. The harmony with the surrounding nature was very nice.