Beijing Metro Map 2026

Sources: bjsubway.com
Beijing Metro Lines & Stations
In 2026, Beijing Metro network has completed Lines 1-19, adding new lines such as Line 17 Middle Section, Line 18 (Malianwa - Tiantongyuan East), and Line 6 South Extension, achieving more comprehensive operational coverage. Key information is as follows:
- Backbone Lines: Line 1 connects Tiananmen and CBD core areas; Line 2 is a loop line covering hubs such as Xizhimen and Beijing Railway Station; after the full opening of Line 17, the whole journey from Jiahui Lake to Weilai Science City North only takes 66 minutes, diverting north-south passenger flow.
- Airport Connection: Capital Airport can be directly reached via the Airport Line; Daxing Airport can be taken via the Beijing-Xiongan R1 Line (fully opened in 2026, initially operating from 4:00 to 1:00 the next day, and 24 hours in the long run).
- Inter-provincial Planning: Line 22 (Pinggu Line) is expected to open at the end of 2026, connecting Chaoyang, Tongzhou in Beijing and Yanjiao in Hebei, with 5 stations in Yanjiao, and it only takes 32 minutes to reach CBD.
Beijing Metro Map - Operating Hours
- Regular Operation: The first train time of each line ranges from 5:00 to 5:39 (e.g., 5:08 at Weilai Science City North Station of Line 17, 5:39 at Malianwa Station of Line 18), and the last train time ranges from 22:30 to 23:25 (e.g., the partial last train of Luyang Station of Line 6 is 23:25).
- Special Line: The initial operating hours of Beijing-Xiongan R1 Line are 4:00 to 1:00 the next day, with a frequency of 3 minutes during peak hours and 10 minutes during off-peak hours, and the designed maximum speed is 200 km/h.
Top Things To do In Beijing




2027 booked












